Twinkle HubTwinkle Hub

UKCS offshore wellbores top holes (WGS84)

uk/ukcs-offshore-wellbores-top-holes-wgs84

OGL-UK-3.0

<p><span style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>A wellbore is a path of drilled footage from the Well Origin to a terminating point. The location of each wellbore is the wellbore's well origin. A well origin is the location on the surface of the earth or sea bed where the drill bit penetrates the earth to establish or rework a well. Definitions for wellbore and well origin taken from PPDM ‘what is a well': https://whatisawell.ppdm.org/.</span><br /><span style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>Data collection starts once a well has been spudded when the operator submits a spud notification on WONS. The NSTA will issue an official well number via WONS, which is to be used for all data and records resulting from the well's drilling.</span><br /><span style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>All well data requirements are set out in the documents Petroleum Operations Notices (PON) 9 (offshore) and PON 9b (onshore).</span><br /><span style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>Onshore operators have a statutory obligation to also supply well data to the British Geological Survey (BGS). Visit the BGS website for more information.</span></p><div style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'>&nbsp;</div><div style='font-family:&quot;Avenir Next W01&quot;, &quot;Avenir Next W00&quot;, &quot;Avenir Next&quot;, Avenir, &quot;Helvetica Neue&quot;, sans-serif; font-size:16px;'><div style='font-family:inherit;'><span style='font-family:&quot;Avenir Next&quot;, &quot;Avenir Next&quot;;'>Wellbore Bottom Hole is the bottom hole location of the borehole at its final measured total depth.</span><br />&nbsp;<font style='font-family:inherit;'>Top Hole - Bottom Hole, Straight Line Connection is a straight line connection from the top hole location and bottom hole location, it is not a wellbore path.</font></div></div>

Claude での​使い方
execute_tool({
  tool_id: "uk_get_dataset",
  arguments: { dataset_id: "ukcs-offshore-wellbores-top-holes-wgs84" }
})